Project granted on: August 2013 – Ongoing
Project Summary: Designing, procurement, preassembling, supply of preassembled skid mounted modules, commissioning , supervision, technical assistance and the operation of the Waste Water Treatment Plant based on 2 separate feeding lines (20 m3/h oily waste water and 80 m3/h non-oily waste water)